God Knew That I Needed You

Sunday, March 2, 2025

MOD PINK MUSHROOM KITCHEN TOWEL SET; Fortuna-AZ

MOD Mushroom Kitchen Towel Set

Thinking of the PNW, led to thinking of mushrooms - the climate is perfect for perfect mushrooms 😉

I cook with a lot of mushrooms; so, I designed my kitchen towel, based around a mushroom towel I had seen online:

Online mushroom patterned kitchen towel.

This towel is worked using bobbins - and a couple textured sts.; but it is not as complicated as it appears to be. Your work will go smoother and quicker is you take the time to prepare the bobbins before they will be needed 👌

Yarn Bobbins.

Materials: cotton yarn in following colors: MC = Pink, CC = Purple; Scrap Yarn to wrap around Yarn Bobbins = 10 ct./5 ct.  wrapped with white & remaining 5 ct. bobbins wrapped individually with White, Beige, Maize, Gold, Red; #9 knitting needles; scissors; crochet hook #J; tapestry needle; large button

##MOD Mushroom Design Graph: 

MOD Mushroom Graph

Terms used:

g st = knit every row

st. st. = stockinette stitch (1 K row = RS - 1 P row = WS)

k = knit

p = purl

MC = main color

CC = contrast color

EO = end off yarn

CO = cast on stitches

EA = each

inc = increase 1 st (make 2 sts in same st)

dec = decrease 1 st (work 2 sts together)

sc = single crochet

dc = double crochet

sl st = slip stitch


With CC & knitting needles, CO 71 sts & work 3 rows g st for hemline foundation.

Rows 4 thru 8: Work these rows in st. st.; drop CC & attach MC

Row 5: K

Row 6: P

Row 7: K 2, P next st, *K 3 sts, P 1* across row; end row with K 1.

Hemline.

Row 8: P; drop MC & attach CC

Rows 9 thru 12: Work these rows in st. st.

Row 13: K 4 sts in CC; then attach MC and knit across row to last 4 sts - work these sts in CC

Row 14 thru 16: Work these rows in st. st. … being sure to keep the end 4 sts EA towel side edge, purple.

Rows 17 thru 32 = Mushroom Pattern: Refer to mushroom pattern graph above, and work the pattern design in jacquard st. st.; you may also outline the mushrooms when the mushroom rows are completed - or outline them before you begin towel topper (whichever way is easier for you, do that 😊).

Bobbin work on the backside of design.
Mushroom detail.

Rows 33 thru 60: Work these rows in st. st. - being sure to keep the end 4 sts EA towel side edge, purple.

Row 61 = Towel Topper Dec R:  K 4 sts in CC; then begin decreases with MC as follows - *K 2 tog, K 3 tog* to last 4 sts; work these sts in CC & EO CC both towel end edges, slipping sts off knitting needle as they are worked . DO NOT CUT MC.

Begin Towel Topper work …

Row 62 (WS): Change from knitting needles to crochet hook and work in sc as follows: dec 1 st EA end until 7 sts remain.

Alternately work 1 row sc & 1 row dc, for 13 rows.

Sl st x3 sc; ch 6 and sl st in same sp; sl st to end. Turn.

Dc x12 in chain loop; EO.

Add a decorative loop edging of your choice (or leave plain).

Sew button in place and weave in loose ends.


MOD GARTER ST SQUARE DISHRAG:

Cast on 2 stitches.

Row 1: Knit 1-Inc 1 st in next st.

Row 2: Knit 1-Inc-knit across the row.

Row 3: Knit 2-Inc-knit across row.

Row 4: Repeat Row 3 until you have 50 stitches on the needle.

Row 5: Knit 1, Knit 2 together, knit to the end of the row. Repeat Row 5 until you have 3 stitches left on the needle; K 3 sts tog - EO off and weave in loose ends.

No comments:

Post a Comment