GOD KNEW I NEEDED YOU

Showing posts with label cable needle knit pattern. Show all posts
Showing posts with label cable needle knit pattern. Show all posts

Monday, April 7, 2025

BEACH HOUSE KITCHEN TOWEL SET; Quartzsite-AZ

MOD Beach House Kitchen Towel Set, finished.

Preparing for our upcoming beachy vagabond life, I knew I wanted beach themed kitchen towel sets ... so, when I saw this cotton yarn skein named 'Beach House', I bought it and designed a simple towel with an edged hemline using a pattern I haven't used in the past.

It fit: and the set came together very well 😁

This pattern may look difficult, but it is really pretty simple & easy to work.

********************

Materials: Cotton Yarn in White (1 skein), Blue (maybe an ounce), & Beach House variegated (1 skein); #10-1/2 knitting needles; #J/10 crochet hook; 1 Cable Needle; 1 Tapestry Needle; 1 medium resin button

Cable Needle


Terms used:

g st = knit every row

st. st. = stockinette stitch (1 K row = RS - 1 P row = WS)

k = knit

p = purl

sp = space

EO = end off yarn

CO = cast on stitches

EA = each

inc = increase 1 st (make 2 sts in same st)

dec = decrease 1 st (work 2 sts together)

sc = single crochet

dc = double crochet

sl st = slip stitch

rpt = repeat

tog = together


With White, CO 73 sts & work 4 rows in g. st.

Row 1: K 7 - *sl 1 st purlwise, k 4, sl st 1 purlwise, K 1* twice; k 31 middle sts; *k 1, sl 1 st purlwise, k 4, sl 1 st purlwise* twice: end with k 7.

Row 2: Purl, and slip the sl sts of previous row.

Row 3: K 7 - *put sl st onto a cable needle & hold in front of work, k2, k st from cable needle - put next 2 sts onto the cable needle & hold in back of work, k 1, k 2 from cable needle, k 1* twice; knit 31 middle sts; *k 1, put sl st on a cable needle & hold in front of work, k 2, k st from cable needle - put next 2 sts onto the cable needle & hold in back of work, k 1, k 2 from cable needle, k 1* twice: end with k 6.

Row 4: Purl across row.

Rows 5 thru 9: Repeat rows 1 -4; drop White and attach Blue.

Rows 10 thru 13: Repeat rows 1 - 4; drop Blue and attach White.

Row 14 thru 21: Repeat rows 1 - 4; drop White and attach Beach House variegated.

Rows 22 thru 61: Work these rows in st. st.; DO NOT CUT YARN.

Row 62: Continuing with variegated yarn, decrease across row as follows: P 2 – P 3 tog across row to last 2 sts: end P 2 sts.

Change from knitting needles to crochet hook and work in sc as follows: dec 1 st EA end until 8 sts remain; EO Beach House and attach Blue.

Alternately work 1 row sc & 1 row dc, for 13 rows.

Sl st x3 sc; ch 6 and sl st in same sp; sl st to end. Turn.

Dc x12 in chain loop; EO.

Add a decorative loop edging of your choice (or leave plain).

Sew button in place and weave in loose ends.


MOD GARTER ST SQUARE DISHRAG:

MOD Matching Dishrag.

Cast on 2 stitches.

Row 1: Knit 1-Inc 1 st in next st.

Row 2: Knit 1-Inc-knit across the row.

Row 3: Knit 2-Inc-knit across row.

Row 4: Repeat Row 3 until you have 50 stitches on the needle.

Row 5: Knit 1, Knit 2 together, knit to the end of the row. Repeat Row 5 until you have 3 stitches left on the needle; K 3 sts tog - EO off and weave in loose ends.